Request a GridFit Screen

Send us the site. We screen the grid around it, review the result, and email you a link to your report with a password in a separate email. The MW and the date sharpen the answer if you have them.

No site yet? Start with a where-to-look report.

Give us the MW and the date. We return numbered search areas around substations that could carry your load, and who else already has datacenter load sanctioned there. Then send us a site in an area and we screen its routes.

What the report covers

  • The ways your site could connect to the grid, with how long each usually takes against your dates.
  • Who else has datacenter load sanctioned at each substation, where it is published.
  • Whether two independent supplies look possible, and where a campus needs a new substation.
  • Local issues near the site that could affect a connection.

Our team checks every report before it is sent. It is a desktop screening, not a connection offer.

About you
Where

With a plot boundary we measure distances from the plot edge, not a single point.

How much power, and when

What it is for (tick all that apply)

This helps us pick a typical PUE if you leave it blank. It does not change the grid answer.

Give each phase as the total MW of IT running by that date, not the amount added. If you leave PUE blank, we use a typical figure for your use and show it in the report. For a site you can leave the MW and date blank. We then screen it for 50 MW of IT by 2028 and say so in the report.