01
Campus search From one brief to a ranked shortlist.
For developers, operators and investors with a requirement and no site yet.
Candidate areas and sites compared on power, timing, land, water and hazards A recommended site, with the next check to make An Audit on the leading site when you are ready to decide Discuss this 02
Site pack for landowners What your land can support as a datacenter site, with the evidence attached.
For landowners, industrial parks and state agencies presenting land.
A short document to share with developers and investors The datacenter load the land can support, the grid route and an indicative time to power Water, hazards, the approval path and the open questions, each with its next check Discuss this 03
Checks for investors and lenders Which announced MW has a credible power date, before committee.
For private equity, infrastructure funds, banks and their diligence advisers.
A Screen on each site, on diligence timelines Competing projects that depend on the same grid An Audit on the sites that carry most of the value Discuss this 04
Field diligence Physical evidence, added to the Audit.
For teams that have chosen a site and need it verified on the ground.
Topographic and boundary survey Geotechnical investigation Air, water and soil sampling A survey of the route to the grid connection Discuss this 05
Alongside your adviser Our evidence inside your deliverable. You keep the client.
For MEP, engineering, advisory and diligence firms.
A Screen before concept work starts The open questions and evidence list for utility meetings Grid and site evidence for your report, credited and source-linked Discuss this